Dr. Catherine M. Harmonosky
Associate Professor
304 Leonhard Building
University Park, PA 16802
Phone: (814) 865-2107 / Fax: 814-863-4745
E-mail: cmhie@engr.psu.edu
Profile
Dr. Harmonosky teaches courses in Simulation of Manufacturing Systems, Scheduling, and Production Planning & Control. Her current and completed funded projects have been in the areas of scheduling/production control, real-time simulation applications and inventory systems in the health-care industry.
Education
Ph.D. , Industrial Engineering, Purdue University
M.S. , Industrial Engineering, Purdue University
B.S. , Industrial Engineering, The Pennsylvania State University
Honors and Awards
Outstanding Advising Award, PSU College of Engineering, 1996.
Outstanding Young Engineer of the Year Award (Academia), Institute of Industrial Engineers, 1994.
Earl E. Walker Outstanding Young Manufacturing Engineer Award, Society of Manufacturing Engineers, 1993.
Research Interests
Real-time scheduling/control in computer integrated manufacturing systems using simulation as a look-ahead decision-making tool
Studying the relationship between increased manufacturing system flexibility and the production controllability of the system, including development of controllability measures
Analyzing the materials management pipeline in the healthcare industry from manufacturer to distributor to hospital
Memberships
Institute of Industrial Engineers
Society of Manufacturing Engineers
Society of Women Engineers
American Society for Engineering Education
Selected Publications
Harmonosky, C.M. and S.F. Robohn, "Investigating the Application Potential of Simulation to Real-Time Control Decisions", International Journal of Computer Integrated Manufacturing, Vol. 8, No. 2, 1995, 126-132.
Harmonosky, C.M., "Simulation-Based Real-Time Scheduling: Review of Recent Developments", Proceedings of the 1995 Winter Simulation Conference, C. Alexopoulos and K. Kang, Editors, December 1995, pp. 817-823.
Ventura, J.A., C.M. Harmonosky, P.F. Egbelu, and M.X. Weng, "A Distributor's Profit Model for the Healthcare Industry", Journal for the Society of Health Systems, Vol. 2, No. 1, 1995, 15-24.
Harmonosky, C.M. and G.K. Tothero, "A Multi-Factor Plant Layout Methodology", International Journal of Production Research, Vol. 30, No. 8, 1992, 1773-1789.
Harmonosky, C.M. and S.F. Robohn, "Real-Time Scheduling in Computer Integrated Manufacturing: A Review of Recent Research", International Journal of Computer Integrated Manufacturing, Vol. 4, No. 6, 1991, 331-340.
