Harold and Inge Marcus Department of

Industrial and Manufacturing Engineering

The first Industrial Engineering department in the world


Dr. Catherine M. Harmonosky

Associate Professor

304 Leonhard Building

University Park, PA 16802

Phone: (814) 865-2107 / Fax: 814-863-4745

E-mail: cmhie@engr.psu.edu


Profile

Dr. Harmonosky teaches courses in Simulation of Manufacturing Systems, Scheduling, and Production Planning & Control. Her current and completed funded projects have been in the areas of scheduling/production control, real-time simulation applications and inventory systems in the health-care industry.

Education

Ph.D. , Industrial Engineering, Purdue University

M.S. , Industrial Engineering, Purdue University

B.S. , Industrial Engineering, The Pennsylvania State University

Honors and Awards

Outstanding Advising Award, PSU College of Engineering, 1996.

Outstanding Young Engineer of the Year Award (Academia), Institute of Industrial Engineers, 1994.

Earl E. Walker Outstanding Young Manufacturing Engineer Award, Society of Manufacturing Engineers, 1993.

Research Interests

Real-time scheduling/control in computer integrated manufacturing systems using simulation as a look-ahead decision-making tool

Studying the relationship between increased manufacturing system flexibility and the production controllability of the system, including development of controllability measures

Analyzing the materials management pipeline in the healthcare industry from manufacturer to distributor to hospital

Memberships

Institute of Industrial Engineers

Society of Manufacturing Engineers

Society of Women Engineers

American Society for Engineering Education

Selected Publications

Harmonosky, C.M. and S.F. Robohn, "Investigating the Application Potential of Simulation to Real-Time Control Decisions", International Journal of Computer Integrated Manufacturing, Vol. 8, No. 2, 1995, 126-132.

Harmonosky, C.M., "Simulation-Based Real-Time Scheduling: Review of Recent Developments", Proceedings of the 1995 Winter Simulation Conference, C. Alexopoulos and K. Kang, Editors, December 1995, pp. 817-823.

Ventura, J.A., C.M. Harmonosky, P.F. Egbelu, and M.X. Weng, "A Distributor's Profit Model for the Healthcare Industry", Journal for the Society of Health Systems, Vol. 2, No. 1, 1995, 15-24.

Harmonosky, C.M. and G.K. Tothero, "A Multi-Factor Plant Layout Methodology", International Journal of Production Research, Vol. 30, No. 8, 1992, 1773-1789.

Harmonosky, C.M. and S.F. Robohn, "Real-Time Scheduling in Computer Integrated Manufacturing: A Review of Recent Research", International Journal of Computer Integrated Manufacturing, Vol. 4, No. 6, 1991, 331-340.